DONG Energy CL20 Rear cooler ColdLogik case study installation

Dong Energy, Denmark

New build data centre

The Client

DONG Energy was established in 2006 by the merger of six Danish energy companies: DONG, Elsam, Energi E2, Nesa, Københavns Energi and Frederiksberg Forsyning.
It was created as a vehicle to develop Danish energy activities. The company has expanded significantly through organic growth and acquisitions both in Denmark and across Europe.
时时分分彩票下载 The merger brought together a wide range of experience, resources and activities, including oil and natural gas exploration and production, electricity generation at power stations and renewable energy facilities and natural gas and electricity distribution.

The brief

in 2009 dong energy required an energy efficient cutting edge design for the cooling of their state of the art new build data centre in denmark.

Parameters

the site had to retain a small footprint whilst maximising the density - for this they requested 15kw - 30kw capacity for each cabinet with a water supply temperature of 15°c. they required a tier 3 n+1 and opted for chillers and dry air cooler in their external space.

Solution

时时分分彩票下载usystems installed 23 42u cabinets with cl20 c8 rear coolers within the white space of the data centre build enabling them the packaging densities required with capacity to increase heat loads in the future within the same footprint.

Kilowatt duty

时时分分彩票下载the total for this 23 cabinet data centre is 350kw

Energy savings

the coldlogik solution offered a 90% saving on the crac based design dong had previously been quoted for.

Room density

23 racks - 23 ColdLogik rear coolers 15-30kW per rack

External plant

时时分分彩票下载2 x chiller and 1 x dry air cooler.

Future

dong energy have subsequently replaced an existing crac based system with coldlogik cl20 and are planning further upgrades.

 

DONG Energy CL20 Rear cooler ColdLogik case study installation
DONG Energy CL20 Rear cooler Retrofitted to SAN Cabinets case study installation
DONG Energy Top Box ColdLogik case study installation
DONG Energy CL20 Rear cooler ColdLogik case study installation valves
DONG Energy CL20 Rear cooler ColdLogik case study installation pipe work
Client Comments
Since having the system installed we have now replaced other CRAC based systems with ColdLogik and are planning further expansion of our datacentre utilising ColdLogik.

call our dedicated solutions team

+44 (0)1234 761720
江苏快三今天开奖结果查询 三地连线走势图 天天竞猜红黑大战 彩票下载app领取38元彩金 11选5选号精灵